Full-line Dust Collecting System
Full-line Dust Collecting System
Full-line Dust Collecting System
+
  • Full-line Dust Collecting System
  • Full-line Dust Collecting System
  • Full-line Dust Collecting System

Description

For all materials, from feeding, batching, measuring, adding to mixing and discharging are carried out under airtight condition. The dust exhaust pipe of mixer cover, sand metering hopper, cement, fly ash metering hopper, powder admixture metering hopper and baler are all connected to the dust collector, so as to reduce the emission of dust and the pollution of dust to the environment.

 

Our company adopts MC type series bag filter with the following characteristics:

(1) Wide range of application. This model series dust collector can be used for dust pollution control in various industries. Applied in cement industry, it can be applied to various working conditions.

(2) Reasonable structural design, small footprint, investment, easy to use and operate, stable and reliable operation, large capacity to handle gas, high dust removal efficiency and material recycling utilization rate, integrating economic and environmental benefits.

(3)Adopting international advanced dust cleaning technology, selecting different specifications and performance of filter media according to the working environment, the filter bag is not sticky and clogged, no condensation, low energy consumption and long service life.

(4)Improve the ventilation condition of the host equipment, improve the working condition environment with complex powder composition and strong corrosion-resistant force.

Translated with DeepL.com (free version)

 


Full-line Dust Collecting System

For all materials, from feeding, batching, measuring, adding to mixing and discharging are carried out under airtight condition.
Full-line Dust Collecting System
Full-line Dust Collecting System
Full-line Dust Collecting System
+
  • Full-line Dust Collecting System
  • Full-line Dust Collecting System
  • Full-line Dust Collecting System

Classification


Customer visits

Customer Visits5
Customer Visits4
Customer Visits3
Customer Visits2

Packaging and Shipping

Packaging and Shipping5
Packaging and Shipping4
Packaging and Shipping3
Packaging and Shipping2

FAQs

Can engineers be sent to our site for installation and training?


We’ll send experienced engineers to the customer's site to guide equipment installation and debug the equipment. We will also provide installation instructions, layout drawings, assembly drawings, etc.

What is the positioning and cost performance of your products?


We have professional engineers, skilled production workers, high-standard quality inspection, and pre-sales and after-sales service teams with effective communication. We can assemble and test all the equipment and pack them carefully before delivery. Maybe our price is not the lowest, but we pursue the best service and quality and we are definitely your most suitable and trustworthy partner.

Are you a factory, a design company, or a trading company?


We are a manufacture factory with our own mechanical and project design engineers. We can provide customized solution design according to customers’ requirement, and full-process services such as early project discussion, scheme design, equipment selection, site planning, equipment layout, transportation and delivery, installation and commissioning.

Can you provide technical and process guidance?


Yes. We have rich experience in mortar production, and we will customize the equipment according to your needs and provide a full range of project guidance. We can reasonably design the layout and site planning according to the size of your workshop, and provide technical support for mortar formulas.

I don't have the formula, can you send me one?


Yes, we have more than 500 customers and they are willing to share the formula.

What about the Minimum Order Quantity?


The MOQ is 1pcs.

What about the warranty time?


12 months after shipment or 2000 working hours.

How long is the production and delivery time?


The general equipment production period is about 20-30 working days. After the equipment production is completed, you can come to our factory in person, send someone to our factory, or ask us to provide photos and videos of the finished product for inspection. The delivery time of different countries is different, about 10-40 days. We will provide photos and videos of equipment loading throughout the delivery process, as well as official customs clearance information.

Can I visit your factory and your customer’s factory?


Yes, you can come by yourself or ask your friend in China to visit our factory or our customer's production factory. Welcome to visit our factory, and we can provide you with the invitation letter required for visa application. We will meet you at the airport or station and offer professional business reception services.

What kind of terms of payment can be accepted?


L/C, T/T could be accepted.

Get A Quote

Note: Please leave your contact information and our professionals will contact you as soon as possible!

Submit

Send Us a Message

Main Features* Note: Please be sure to fill in the information accurately and keep communication open, we will get in touch with you as soon as possible

Submission